Main Pass Block 61
Oil Processing Facility 20,000 BOPD, 20 MMSCFD

Oil Processing Facility 20,000 BOPD, 20 MMSCFD

Gas Processing Facility 2,000 BOPD, 120 MMSCFD

Onshore Production Facility 150,000 BOPD

Subsea Tieback to Grand Isle 115, 20,000 BCPD, 100 MMSCFD

50,000 BOPD, 60,000 BWPD, 45 MMSCFD

Waterflood 80,000 BWPD

16” Pipeline Installation and Metering Facility (Marshland Terrain)

Condensate Stabilization System Upgrade

Valve Site, Measurement Station South Louisiana

Gas Storage Facilities

Smart Pigging Retrofit 20” Pipeline

NGL Pumping Station Service Change

6-Wells, 4-Pile 189 ft. Water Depth

8-Leg, 4-Pile, Terminal Facility 95 ft. Water Depth

18-Wells, 4-Pile 265 ft. Water Depth

6-Well, 4-Pile157 ft. Water Depth

Storage Tank Foundation

128 Bed Living Quarters 35,490 Square Feet