Main Pass Block 61
Oil Processing Facility 20,000 BOPD, 20 MMSCFD
Oil Processing Facility 20,000 BOPD, 20 MMSCFD
Gas Processing Facility 2,000 BOPD, 120 MMSCFD
Onshore Production Facility 150,000 BOPD
Subsea Tieback to Grand Isle 115, 20,000 BCPD, 100 MMSCFD
50,000 BOPD, 60,000 BWPD, 45 MMSCFD
Waterflood 80,000 BWPD
16” Pipeline Installation and Metering Facility (Marshland Terrain)
Condensate Stabilization System Upgrade
Valve Site, Measurement Station South Louisiana
Gas Storage Facilities
Smart Pigging Retrofit 20” Pipeline
NGL Pumping Station Service Change
6-Wells, 4-Pile 189 ft. Water Depth
8-Leg, 4-Pile, Terminal Facility 95 ft. Water Depth
18-Wells, 4-Pile 265 ft. Water Depth
6-Well, 4-Pile157 ft. Water Depth
Storage Tank Foundation
128 Bed Living Quarters 35,490 Square Feet
Opening Hours: Monday – Friday 7:30 am – 4:30 pm
© Copyright 2023, Technical Engineering Consultants, LLC